Build Your Thermal Solution with Morton

Air & Liquid CoolingHeat sinks, heat pipe assemblies and liquid cold plates for industrial equipment.
Engineering Around Your NeedsMatch your heat load, space, mounting and operating conditions.
Traceable QualityDrawing revisions, inspection records and agreed acceptance criteria.
From Samples to SupplySupport for development samples, project orders and repeat production.
A Clear Next StepYour inquiry receives a response within one working day.

Start Your Thermal Project

Share your request below. We will respond within one working day to clarify your needs and the next step.

Optional. Choose a country, or enter a full number starting with +.

Copper Skived Fin Heat Sink macro engineering workbench photo
MORTON · CUSTOM THERMAL ENGINEERING

Skived Fin Heat Sinks for Compact Power Electronics

Bring more cooling surface into limited space with integral copper or aluminum fins, engineered around your heat load, airflow and mounting envelope.

Integral fins. Defined airflow. Production-ready geometry.
Start with your heat load, available space and airflow.
Discuss My Skived Fin Design
Copper skived fins formed directly from a continuous base
Copper skived fins formed directly from a continuous base.

One Piece. A Direct Path from Base to Fin

Skiving cuts and raises thin fins from the parent metal, keeping every fin connected to the base without an added fin-to-base bonding layer.

Integral construction
Heat conducts from the base into fins formed from the same metal.
High surface density
Thin, closely spaced fins add exposed area within a compact envelope.
Application-led design
Material, fin spacing and base thickness are selected together for your operating conditions.
Find out whether integral fins fit your thermal and mechanical constraints.
Review My Application

More Cooling Surface, with the Details Under Control

Get the benefit of dense fins while keeping airflow, assembly and manufacturing consistency part of the same design decision.

A continuous thermal path

Eliminate the separate fin-to-base joint. Keep heat moving through a single metal structure.

Surface area in tight spaces

Fit thin plate fins into compact equipment. Match density to the pressure available from the installed fan.

A defined mechanical interface

Machine mounting holes, cutouts and contact faces around the approved assembly. Reduce fit issues during integration.

Repeatable production geometry

Control fin thickness, clear gap and straightness against the drawing. Carry the approved geometry into every production batch.

Turn the thermal goal into a manufacturable fin structure.

Request a Geometry Review

Copper or Aluminum? Choose for the Whole Assembly

The right material balances heat spreading, weight, finishing and cost, rather than conductivity alone.

Copper skived profile Integral Copper Fin Profile
Thermal Spreading Priority

Copper · C1100 / T2

Prioritize heat spreading around concentrated heat sources. A useful route for compact power assemblies where mass is acceptable.

Consider: weight, oxidation protection and mounting loads.
Aluminum skived profile Integral Aluminum Fin Profile
Lightweight Assembly Priority

Aluminum · 6063 / 1060

Prioritize a lighter assembly and practical surface treatment options. Balance fin geometry and airflow against the required temperature limit.

Consider: alloy condition, stiffness and the selected finish.
Selection inputs
Heat-source footprint
Temperature limit
Mass allowance
Surface requirements

Share the constraints that matter most to your assembly.

Compare Material Options

Define the Fin Geometry Before You Freeze the Design

Use these normal manufacturing ranges to start the discussion, then review the complete combination against strength, airflow and assembly requirements.

Materials 6063 / 1060 aluminum; C1100 / T2 copper
Typical overall envelope 30–250 × 30–350 × 10–100 mm
Fin thickness 0.3–0.8 mm
Clear fin gap 0.8–2.5 mm
Contact face and mounting features CNC finished to the approved drawing
Geometry note: Fin thickness, clear gap, height and base thickness are reviewed as one design.
Fin Geometry Detail 1-Piece Integral
Skived fin geometry macro

Send your envelope and contact footprint for a practical geometry check.

Check My Dimensions

Dense Fins Need the Right Airflow Path

More fins help only when air reaches the channels. We evaluate the heat sink together with the fan, duct and pressure losses in the installed system.

Controlled Airflow Fixture
Skived duct validation
1

Measure through-flow

Use the airflow that actually passes through the fin channels, with the duct and enclosure in place.

2

Check the working point

Match heat sink pressure loss with the fan curve and the losses elsewhere in the system.

3

Control bypass and blockage

Review inlet clearance, sealing, dust exposure and the exit path to make the available airflow useful.

Bring the fan curve and duct layout into the thermal review.

Review My Airflow Path

Make the Contact Interface Work as Hard as the Fins

A good fin structure still depends on a flat contact face, the right interface material and a controlled mounting load.

Contact face

Specify the functional area, flatness and roughness from the device and TIM requirements. Keep finishing requirements tied to the final treated part.

Interface material

Choose thickness and compression from the real gap and permitted device load. A thicker pad is not automatically a better thermal interface.

Mounting control

Review hole positions, spring hardware, torque and board clearance together. Maintain contact without overstressing the assembly.

Contact & Mounting Detail
Skived spring mounting
Align the heat sink, TIM and mounting method in one review.
Check My Mounting Interface

Built Around Compact, High-Density Equipment

Skived fins are a practical option where concentrated heat and limited space meet a defined forced-air cooling path.

Industrial power conversion module

Power conversion modules

Balance heat spreading and fin pressure drop around densely packed power devices.

Industrial computing constrained chassis

Industrial computing

Fit cooling into constrained chassis where airflow direction and mounting height are already defined.

Telecom power rectifier rack with organized electrical wiring

Telecom power equipment

Match compact rectifier and DC/DC assemblies to the actual inlet conditions and service environment.

Tell us how the heat sink will operate inside your equipment.
Match My Application

250 W in a 100 × 100 × 35 mm Envelope

A copper skived fin design helped a German server power supply OEM lower the base hot-spot temperature under the same installed test conditions.

Measured Base Hot Spot Calibrated Sensor
Previous structure 82.5 °C
82.5 °C
Skived fin design about 70 °C
~70 °C (-12.5 K)
Thermal Resistance Improvement
0.23 → about 0.18 K/W
Base hot spot to inlet air under continuous ducted flow.
Operating Baseline
Test Conditions

Heat load 250 W; heat source 30 × 30 mm; inlet air 25 °C; measured through-fin airflow 60 m³/h under a duct.

Geometric Implementation
Design Solution

C1100 copper; 0.5 mm fins; 1.2 mm clear gap; controlled 0.2 mm interface material; spring screws and inlet-flow optimization.

Production Outcome
Validation & Repeat Batches

About 12.5 K lower base temperature; first delivery of 1,200 pieces; repeat orders of 500–1,000 pieces per month.

250 W
Heat load validated
12.5 K
Lower base temperature
1,200 pcs
First production delivery

Define a comparable test around your own heat source and airflow.

Discuss My Thermal Target

From Parent Metal to a Controlled Finished Part

Keep material, skiving, machining and finishing tied to the same drawing revision so the delivered part matches the approved sample.

Step 01
Verify the stock

Confirm alloy, parent-stock dimensions and material batch identity.

Step 02
Form the fins

Control skiving thickness, clear gap and straightness as the fins are raised from the base.

Step 03
Machine the interface

Finish contact faces, mounting holes and required cutouts from defined datums.

Step 04
Apply the finish

Protect the specified surfaces and mask thermal or grounding interfaces where required.

Step 05
Inspect and release

Check the drawing requirements, cleanliness, identification and protective packing.

Build the manufacturing route around your approved geometry.

Request a DFM Review
CMM contact probe measuring copper skived heat sink base mounting pad
Direct tactile probe inspection on machined base flange datum.

Quality Checks That Follow the Thermal Design

Control the features that affect contact, airflow and assembly, with records linked to the part revision and production batch.

Material and traceability

Link incoming material identity, work orders and inspection records to the delivered batch.

Critical dimensions

Check fin spacing, straightness, hole positions and the contact face against the control plan.

Thermal verification

Record heat-source size, power, inlet temperature, actual airflow, air pressure drop and sensor locations.

Release documentation

Provide the agreed FAI, dimensional report, material documentation and certificate of conformity.

Set the acceptance criteria before the first sample is made.

Define My Inspection Plan

Make Your Drawing Ready for a Useful Engineering Review

A few clear inputs let us assess the skived fin structure, mounting interface and production route without repeated clarification.

Thermal brief

Continuous and peak losses; heat-source size and layout; inlet temperature; target base or device temperature.

Mechanical envelope

STEP or 2D drawing; height limit; mounting pattern; contact areas; clearance and mass requirements.

Airflow conditions

Installed airflow or fan curve; duct layout; pressure allowance; dust and service conditions.

Supply requirements

Sample quantity; annual demand; preferred material and finish; inspection and documentation needs.

File formats: STEP / STP / IGES for 3D models; PDF / DWG / DXF for 2D drawings.

Have a drawing or an early thermal brief? Start there.

Share My Project Brief

A Clear Route from Samples to Repeat Supply

Move from engineering approval to scheduled production with a defined drawing, acceptance plan and delivery agreement.

Phase 01

Engineering samples

Paid samples can start from one piece. Typical made-to-drawing samples take 10–20 working days after drawing freeze.

Phase 02

Production approval

Confirm the approved sample, critical dimensions, finish and documents. Typical skived fin production MOQ is 50–100 pieces, depending on the design.

Phase 03

Repeat deliveries

Agree the forecast, batch size and order conditions. Carry the approved revision into scheduled releases and controlled engineering changes.

30,000
skived fin heat sinks per year
4
skiving machines
5-year
traceability records
Plan the sample batch and the production release together.
Plan My Supply Program

Questions Engineers Ask Before Choosing Skived Fins

Resolve the material, airflow and production questions that shape a practical skived fin heat sink specification.

Are skived fins always better than extruded fins?
No. Skiving can provide thinner, denser fins and an integral fin-to-base path, but the result depends on geometry, airflow, pressure loss and cost. We compare the route against the actual application.
Can you manufacture both copper and aluminum designs?
Yes. Common materials are C1100 / T2 copper and 6063 / 1060 aluminum. We confirm alloy, material condition, geometry and finishing together during DFM.
What airflow information do you need?
The airflow through the installed heat sink, fan curve, duct arrangement and pressure allowance. Free-air fan flow alone does not define the installed operating point.
Can dense skived fins be used with natural convection?
Some geometries can, but closely spaced fins often need forced airflow. Orientation, spacing and temperature rise must be assessed for the intended natural-convection conditions.
Can you add mounting holes, cutouts and a finished contact face?
Yes. We review CNC access, datums, flatness, surface finish and remaining material before freezing the drawing.
What should I send to request a quotation?
Send the drawing or envelope, material preference, heat load, heat-source footprint, airflow conditions, sample quantity and annual demand. Include required inspection and compliance documents.
Bring the remaining questions to an engineer.
Ask About My Design
Aluminum skived fin heat sink on an engineering workbench

Let’s Engineer Your Skived Fin Heat Sink

Share your thermal target and mechanical constraints. We will review the right starting point for material, fin geometry and validation.

Copper and aluminum material options
Geometry reviewed against real airflow
CNC-finished contact and mounting features
Sample-to-production engineering support
Traceable inspection and release records

Tell Us About Your Project

Your project information stays confidential.
Initial response within one working day.