Build Your Thermal Solution with Morton

Air & Liquid CoolingHeat sinks, heat pipe assemblies and liquid cold plates for industrial equipment.
Engineering Around Your NeedsMatch your heat load, space, mounting and operating conditions.
Traceable QualityDrawing revisions, inspection records and agreed acceptance criteria.
From Samples to SupplySupport for development samples, project orders and repeat production.
A Clear Next StepYour inquiry receives a response within one working day.

Start Your Thermal Project

Share your request below. We will respond within one working day to clarify your needs and the next step.

Optional. Choose a country, or enter a full number starting with +.

Industrial machine vision automated inspection conveyor line
morton | Industrial Imaging Case Study

Vapor Chamber Cooling for Industrial Machine Vision

A 3 mm copper vapor chamber spreads a 300 W processor hotspot across a compact fin assembly, helping a Japanese industrial imaging OEM meet its temperature-uniformity target within a 45 mm height limit.

300 W
Processor heat load
3 mm
Vapor chamber thickness
6 K
Center-to-perimeter difference
800 units
First production delivery
Bring your hotspot, airflow and height constraints to our engineering team.
Discuss Your Cooling Requirements

A Compact Controller for Continuous Vision Processing

The customer needed a thermal assembly for an industrial image-processing platform, with a concentrated processor load and limited room around the PCB.

Industrial area-scan camera and separate enclosed processing controller
Industrial vision inspection combines image acquisition, real-time processing and tightly packaged control hardware.

300 W at the source

A 20 × 20 mm processor contact area concentrates the thermal load into a small footprint.

150 × 150 × 45 mm

The complete cooling assembly must stay within the existing mechanical envelope.

25°C inlet air

The thermal evaluation uses a defined air inlet temperature for repeatable measurements.

160 m³/h installed airflow

Air passes through the fin assembly under the specified test setup.

Share your controller envelope and installed airflow to define the design boundary.
Review My Application

The Challenge Was Spreading Heat Within a Fixed Envelope

Increasing fin area alone would not address the concentrated heat input, limited assembly height and sensitive mechanical interface.

Concentrated heat input

The 20 × 20 mm source occupies only a small part of the available base area. Heat must spread laterally before the full fin field can contribute.

A strict height budget

The 45 mm assembly envelope leaves little room for a thicker solid base or taller fins. The spreading layer must preserve useful fin height.

A sensitive PCB interface

Contact flatness, clamping load and component clearance must work together, so improved cooling does not introduce board stress or assembly interference.

Identify the thermal and mechanical bottlenecks before committing to a larger heat sink.
Assess My Hotspot

Clear Acceptance Criteria Before Hardware Release

The project linked thermal uniformity, mechanical fit and interface quality to a defined test and inspection plan.

Criterion Project requirement Verification
Temperature uniformity Hotspot-to-perimeter base difference ≤8 K Measure the hotspot and defined perimeter locations under the same steady-state load.
Assembly envelope 150 × 150 × 45 mm maximum Check the complete assembly against the controller clearance model.
Interface flatness ≤0.05 mm over a 100 mm span Inspect the finished contact surface against the drawing datum.
Thermal test boundary 300 W; 25°C inlet; 160 m³/h airflow Record power, inlet temperature, airflow and sensor locations together.
Temperature uniformity
Project requirement Hotspot-to-perimeter base difference ≤8 K
Verification Measure the hotspot and defined perimeter locations under the same steady-state load.
Assembly envelope
Project requirement 150 × 150 × 45 mm maximum
Verification Check the complete assembly against the controller clearance model.
Interface flatness
Project requirement ≤0.05 mm over a 100 mm span
Verification Inspect the finished contact surface against the drawing datum.
Thermal test boundary
Project requirement 300 W; 25°C inlet; 160 m³/h airflow
Verification Record power, inlet temperature, airflow and sensor locations together.

Contact integrity

Review the locating features and clamping load with the customer assembly.

Defined comparison

Use the same source area, mounting setup and measurement locations when assessing performance.

Turn your temperature limit and drawing requirements into a measurable acceptance plan.
Define My Acceptance Criteria
Physical aluminum heat sink and sealed copper vapor chamber on an engineering bench
Aluminum fin assembly
3 mm copper vapor chamber
Precision copper contact interface

A 3 mm Vapor Chamber at the Heart of the Assembly

morton combined a copper vapor chamber, a precision-located copper contact surface and aluminum fins to spread heat across the available footprint while retaining the low-profile package.

Copper vapor chamber
The 3 mm spreading layer distributes the small-area heat input across a larger condenser surface.
Precision copper contact
Controlled contact geometry and a flat mounting interface support consistent heat transfer from the processor.
Aluminum fin assembly
A fin field matched to the defined airflow rejects heat within the 150 × 150 × 45 mm envelope.

Adapt the spreading layer, contact geometry and fin assembly to your controller.

Explore a Custom Vapor Chamber Assembly

Engineering the Thermal Path and the Mechanical Interface Together

The team reviewed the details that determine whether a thin spreading layer remains effective after it is installed in the real controller.

Support the thin chamber
Review internal support locations and the external load path to protect the spreading layer under the specified mounting force.
Control the contact surface
Hold mounting-face flatness to 0.05 mm over 100 mm and align the copper contact features to the approved drawing.
Protect PCB clearance
Check component keep-out zones, locating features and screw access before freezing the assembly geometry.
Use the defined air path
Evaluate the fin assembly with the installed airflow and mounting arrangement, so the test reflects the intended controller configuration.

Resolve chamber support, contact pressure and PCB clearance in one engineering review.

Request a DFM Review

Test Conditions That Make the Results Reproducible

The validation paired thermal measurements with dimensional and clamping checks, connecting the reported result to a defined source, airflow and installation.

Industrial thermal testing bench laboratory setting with compact straight-fin heat sink and DAQ setup
1

Fix the thermal boundary

Apply 300 W over the 20 × 20 mm source with inlet air at 25°C and 160 m³/h through the assembly.

2

Map the base temperatures

Measure the base hotspot and defined outer-perimeter locations to evaluate lateral temperature uniformity.

3

Verify the installation

Complete first-article dimensional checks and clamping-force validation with the specified contact interface.

4

Connect data to the drawing

Retain sensor locations, assembly revision and mounting conditions with the thermal measurement record.

Base-to-inlet thermal resistance: (67°C − 25°C) / 300 W = 0.14 K/W.

Align your test setup with the thermal result you need to qualify.

Discuss the Validation Plan

Measured Performance Within the Project Target

The vapor chamber assembly met the specified base-temperature uniformity requirement in the defined forced-air test.

67°C
Base hotspot temperature
0.14 K/W
Base hotspot to inlet air
6 K
Hotspot-to-perimeter difference
2 K
Margin to the 8 K uniformity limit

Hotspot-to-perimeter base difference

Project limit: ≤8 K
Measured: approximately 6 K
Project limit: ≤8 K 8.0 K max threshold
Measured: approximately 6 K 6.0 K (2 K margin)

Measured at 300 W, with a 20 × 20 mm source, 25°C inlet air and 160 m³/h airflow. The reported 67°C is the base hotspot temperature.

Compare your thermal boundary with the conditions behind these results.

Evaluate My Performance Target

From 20 Engineering Samples to 800 Production Units

The project progressed from dimensional and clamping validation to first production supply, giving the OEM a compact thermal solution with defined acceptance conditions.

20 engineering samples

Validate dimensions, assembly fit and clamping force before approving the production configuration.

First-article release

Link the approved geometry, contact interface and thermal boundary to the manufacturing and inspection requirements.

800-unit first delivery

Transfer the accepted assembly into the first production order while preserving the approved configuration.

Engineering Documentation & Handoff Deliverables
Approved drawing and BOM revision
Contact-surface and critical-dimension inspection
Thermal setup and measurement record
Material and production-lot traceability
Thermal engineering workbench

Bring Your Machine Vision Cooling Challenge to morton

Share your heat source, assembly space and cooling conditions. Our engineering team will review the thermal path, mechanical interface and route to a production-ready assembly.

Hotspot-driven design

Define power and source area before selecting the spreading layer.

Mechanical fit

Review chamber support, contact load and PCB clearance together.

Defined validation

Tie thermal performance to the source, inlet air and installed airflow.

Sample-to-production support

Align engineering samples, first articles and controlled production.

One technical contact

Coordinate the drawing, thermal evidence and manufacturing handoff.

Request an Engineering Review

Tell us what your controller needs to dissipate and where the assembly must fit.

Your project information stays confidential. We provide an initial response within one business day.